Peta Video
Telusuri semua 42 episode berdasarkan seri. Buka seri untuk melihat setiap episodenya.
Telah dirilisSedang dirilisDirencanakan
- Industri · Mutu Farmasi GMP
- GMP Concepts | Pharmaceutical Quality System, Explained10-24Sedang dirilisGMP Concepts | Pharmaceutical Quality System, Explained | 2026-10-24 | Sedang dirilis
- GMP Concepts | Quality Risk Management10-30Sedang dirilisGMP Concepts | Quality Risk Management | 2026-10-30 | Sedang dirilis
- GMP Concepts | Documentation, Explained Once and for All11-02Sedang dirilisGMP Concepts | Documentation, Explained Once and for All | 2026-11-02 | Sedang dirilis
- GMP Concepts|Computerized Systems, Explained in One Go10-19Sedang dirilisGMP Concepts|Computerized Systems, Explained in One Go | 2026-10-19 | Publishing
- GMP Concepts | Qualification and Validation, Explained11-05Sedang dirilisGMP Concepts | Qualification and Validation, Explained | 2026-11-05 | Sedang dirilis
- GMP Concepts | Personnel11-08Sedang dirilisGMP Concepts | Personnel | 2026-11-08 | Sedang dirilis
- GMP Concepts | Premises and Equipment11-11Sedang dirilisGMP Concepts | Premises and Equipment | 2026-11-11 | Sedang dirilis
- GMP Concepts | Production11-14Sedang dirilisGMP Concepts | Production | 2026-11-14 | Sedang dirilis
- GMP Concepts | Quality Control11-17Sedang dirilisGMP Concepts | Quality Control | 2026-11-17 | Sedang dirilis
- GMP Concepts | Sterile Products (1): Contamination Control and Cleanrooms11-20Sedang dirilisGMP Concepts | Sterile Products (1): Contamination Control and Cleanrooms | 2026-11-20 | Sedang dirilis
- GMP Concepts | Sterile Products (2): Aseptic Process Simulation and Environmental Monitoring11-23Tinggal 2 hariTinggal GMP Concepts | Sterile Products (2): Aseptic Process Simulation and Environmental Monitoring | 2026-11-23 | 2 hari
- GMP Concepts | Authorised Person and Batch Release11-26Tinggal 5 hariTinggal GMP Concepts | Authorised Person and Batch Release | 2026-11-26 | 5 hari
- GMP Concepts | Reference and Retention Samples11-29Tinggal 8 hariTinggal GMP Concepts | Reference and Retention Samples | 2026-11-29 | 8 hari
- GMP Concepts | Outsourced Activities12-02Tinggal 11 hariTinggal GMP Concepts | Outsourced Activities | 2026-12-02 | 11 hari
- GMP Concepts | Complaints and Product Recall12-05Tinggal 14 hariTinggal GMP Concepts | Complaints and Product Recall | 2026-12-05 | 14 hari
- GMP Concepts | Self-Inspection12-08Tinggal 17 hariTinggal GMP Concepts | Self-Inspection | 2026-12-08 | 17 hari
- GMP Concepts | Change Control, Deviations and CAPA12-11Tinggal 20 hariTinggal GMP Concepts | Change Control, Deviations and CAPA | 2026-12-11 | 20 hari
- GMP Concepts | Active Pharmaceutical Ingredients (Part II)12-14Tinggal 23 hariTinggal GMP Concepts | Active Pharmaceutical Ingredients (Part II) | 2026-12-14 | 23 hari
- GMP Concepts | Biologics and ATMPs12-17Tinggal 26 hariTinggal GMP Concepts | Biologics and ATMPs | 2026-12-17 | 26 hari
- PIC/S, FDA and NMPA: Three GMP Systems Compared12-20Tinggal 29 hariTinggal PIC/S, FDA and NMPA: Three GMP Systems Compared | 2026-12-20 | 29 hari
- GMP You Need on Your First Day in a Pharma Plant12-23Tinggal 32 hariTinggal GMP You Need on Your First Day in a Pharma Plant | 2026-12-23 | 32 hari
- GMP × Project Management: Seeing GMP Through a Project Manager's Eyes (TBD)01-01Tinggal 41 hariTinggal GMP × Project Management: Seeing GMP Through a Project Manager's Eyes (TBD) | 2027-01-01 | 41 hari
- Why Did One Acne Lotion Spark Four FDA Questions? | How a GMP Inspector Would Ask10-24Sedang dirilisWhy Did One Acne Lotion Spark Four FDA Questions? | How a GMP Inspector Would Ask | 2026-10-24 | Sedang dirilis
- A "Fully Sealed" Wall. So How Did the Drug Get Across?10-31Sedang dirilisA "Fully Sealed" Wall. So How Did the Drug Get Across? | 2026-10-31 | Publishing
- Unclaimed Raw Data Found in a Shred Bin | How a GMP Inspector Would Ask11-03Sedang dirilisUnclaimed Raw Data Found in a Shred Bin | How a GMP Inspector Would Ask | 2026-11-03 | Sedang dirilis
- Nearly Every Validation Cycle Grew Bacteria. Why Did It Still "Pass"? | How a GMP Inspector Would Ask11-06Sedang dirilisNearly Every Validation Cycle Grew Bacteria. Why Did It Still "Pass"? | How a GMP Inspector Would Ask | 2026-11-06 | Sedang dirilis
- Smoke Too Thin to See, Yet Airflow Rated "Excellent"? | How a GMP Inspector Would Ask11-09Sedang dirilisSmoke Too Thin to See, Yet Airflow Rated "Excellent"? | How a GMP Inspector Would Ask | 2026-11-09 | Sedang dirilis
- The Ceiling Was "Not Waterproof" and "Could Not Be Decontaminated" | How a GMP Inspector Would Ask11-13Sedang dirilisThe Ceiling Was "Not Waterproof" and "Could Not Be Decontaminated" | How a GMP Inspector Would Ask | 2026-11-13 | Sedang dirilis
- Batch Record: 12 Interventions. Reality: About 200 | How a GMP Inspector Would Ask11-15Sedang dirilisBatch Record: 12 Interventions. Reality: About 200 | How a GMP Inspector Would Ask | 2026-11-15 | Sedang dirilis
- The same test was repeated up to 11 times. The lab record had none. | How a GMP Inspector Would Ask11-18Sedang dirilisThe same test was repeated up to 11 times. The lab record had none. | How a GMP Inspector Would Ask | 2026-11-18 | Sedang dirilis
- Return air sits overhead. Does first-pass air still reach the line? | How a GMP Inspector Would Ask11-21Sedang dirilisReturn air sits overhead. Does first-pass air still reach the line? | How a GMP Inspector Would Ask | 2026-11-21 | Sedang dirilis
- An 18 mm Piece of Glass in a Vial | FDA 483 Case10-24Sedang dirilisAn 18 mm Piece of Glass in a Vial | FDA 483 Case | 2026-10-24 | Sedang dirilis
- Cleared to Ship Before the Tests Are Done | FDA 483 Case10-29Sedang dirilisCleared to Ship Before the Tests Are Done | FDA 483 Case | 2026-10-29 | Sedang dirilis
- Fill Volume Set by a Recipe That Was Never Validated | FDA 483 Case11-01Sedang dirilisFill Volume Set by a Recipe That Was Never Validated | FDA 483 Case | 2026-11-01 | Sedang dirilis
- Glass, Black Fibers and Hair Barely Detected, Yet the Total "Passes" | FDA 483 Case11-04Sedang dirilisGlass, Black Fibers and Hair Barely Detected, Yet the Total "Passes" | FDA 483 Case | 2026-11-04 | Sedang dirilis
- Three reports, but the plasmid lengths don't match | FDA 483 Case11-07Sedang dirilisThree reports, but the plasmid lengths don't match | FDA 483 Case | 2026-11-07 | Sedang dirilis
- Condensation Hides a Bag Leak | FDA 483 Case11-10Sedang dirilisCondensation Hides a Bag Leak | FDA 483 Case | 2026-11-10 | Sedang dirilis
- Rework on the Packaging Line, Without Quality Knowing | FDA 483 Case11-13Sedang dirilisRework on the Packaging Line, Without Quality Knowing | FDA 483 Case | 2026-11-13 | Sedang dirilis
- 80 Bacterial Isolates, Rejected Batches, Still "No Impact" | FDA 483 Case11-16Sedang dirilis80 Bacterial Isolates, Rejected Batches, Still "No Impact" | FDA 483 Case | 2026-11-16 | Sedang dirilis
- Two Vaccine Drug Substances Got Mixed Up | FDA 483 Case11-19Sedang dirilisTwo Vaccine Drug Substances Got Mixed Up | FDA 483 Case | 2026-11-19 | Sedang dirilis
- Kepemimpinan · Model Mental
- Human 3.0 Explained: Dan Koe's Map for Mind, Body, Spirit & Vocation10-18Sedang dirilisHuman 3.0 Explained: Dan Koe's Map for Mind, Body, Spirit & Vocation | 2026-10-18 | Publishing
- We Always Have a New Self to Discover|Dan Koe: Reset Your Life in a Day10-28Sedang dirilisWe Always Have a New Self to Discover|Dan Koe: Reset Your Life in a Day | 2026-10-28 | Publishing
Video ke- terbaru
How a GMP Inspector Would Ask
Return vents pulled air upward, and first-pass air never reached the filling line.
GMP Concepts
A last check cannot prove an injectable is sterile. So what does?
FDA 483 Case
Another client's virus in vaccine drug substance; the trail wasn't fully investigated.
Seri
GMP Concepts
GMP Concepts takes one topic per episode, from the quality system, documentation and validation to sterile products and batch release: 22 episodes in course order, including the early-release Computerized Systems episode. A new one comes out about every three days, in English and Chinese on the same day.
Total 22 episode · 10 dipublikasikanSemua →
Bedah Tuntas Framework
An animated walk through Dan Koe's Human 3.0 framework: one growth map for mind, body, spirit and vocation.
Total 2 episode · 2 dipublikasikanSemua →
AI Stories
Total 1 episode · 1 dipublikasikanSemua →
How a GMP Inspector Would Ask
Two-to-three-minute vertical shorts that start from a real FDA warning letter and follow the questions an inspector would ask. Each one shares its topic with the GMP Concepts episode from the day before; a new one every three days.
Total 23 episode · 9 dipublikasikanSemua →
FDA 483 Case
Each episode unpacks one real FDA Form 483 observation: what went wrong and why it ended up in the report. Vertical shorts, a new one every three days.
Total 23 episode · 9 dipublikasikanSemua →
GMP Concepts Clips
Highlights cut from GMP Concepts episodes: vertical, about 90 seconds, in English and Chinese.
Total 2 episode · 2 dipublikasikanSemua →

